Looking for a Contractor?
Looking for a Contractor?

Alchatek Blog

Introducing AS Pump Flush

Posted by Kreg Thornley on Dec 7, 2021 10:00:00 AM

Banner Graphic - Introducing AS Pump Flush

Body Graphic - Introducing AS Pump FlushAS Pump Flush is a high-performance pump flush that is friendly to the environment and does an excellent job flushing out injection pumps. AS Pump Flush is a new and improved version of AP Flush 121 and Spetec Pump Cleaner.

Features

  • New and improved formula.
  • Now with more powerful iso neutralizers.
  • For use with most Alchemy-Spetec pumping equipment.
  • Available in 5 Gallon Pails.

Benefits

  • Iso neutralizers protect your pump and hoses.
  • Longer flush shelf life.
  • More repeated flush use.

Want more information about Alchemy-Spetec products?

Download the Info-Packed Leak Seal Product Catalog!

Download the Info-Packed Geotech Product Catalog!

Topics: Equipment & Accessories, All Posts

Winterizing a PolyBadger

Posted by Erik Prinzing on Nov 30, 2021 10:00:00 AM

Banner - Winterizing a PolyBadger

Body - Winterizing a PolyBadgerAs the weather gets colder, contractors in some regions will need to prepare their PolyBadger Lifting Systems for storage during the off-season. We're providing step-by-step instructions for that procedure in this article.

Prepping a PolyBadger for Winter Storage

  1. Establish power to the cabinet and heat the hose (A heater, B heater, and hose) to the target temperature of 130° F.
  2. Introduce material to the cabinet.
  3. Turn the air supply on and recirculate to heat up the ISO and resin.
  4. Once the PolyBadger is up to temperature, turn off the air supply and remove airlines from the stick pumps.
  5. Remove the supply and the recirculation line from the A-side stick pump.
  6. Drain all the remaining material from the pump and clean with brake cleaner.
  7. Place the stick A side stubby stick pump into a 5-gallon pail of the AP Flush 121.
  8. Reconnect the supply line and leave the recirculation line to drain in a purge pail.
  9. Repeat steps 5-8 on the B-side stick pump.
  10. Reconnect air supply to stick pumps, hold return lines in a purge pail, and slowly open the air valve on the stick pumps.
  11. You will notice material slowly pushed out of the recirculation line into the purge pail. Continue to pump AP Flush 121 through the system until it comes out of the recirculation line clear, with no added color or debris.
  12. Shut the air valve supplying the stick pumps. This will stop the flow of material.
  13. Reconnect the recirculation lines to the appropriate stick pump and tighten.
  14. Turn the recirculation pump valves to supply the hose.
  15. You can remove the Handi Gun or leave it on for this stage, holding the hose in the purge pail. Turn on the supply valves on the end of the hose just before the Handi Gun. Slowly open the air valve on the stick pumps and pull the trigger on the gun.
  16. You will notice material slowly pushed out of the hose line into the purge pail. Continue to pump AP Flush 121 through the system until it comes out of the hose line clear, with no added color or debris.
  17. Shut the air valve supplying the stick pumps. This will stop the flow of material.
  18. Remove the stick pumps from the AP Flush 121. (Make sure to mark your pails A and B for future use).
  19. Insert stick pumps into AP Pump Saver 195. (Make sure to mark your pails A and B for future use)
  20. Push the AP Pump Saver 195 through the hose line. You will notice the AP Flush 121 slowly pushed out of the hose line into the purge pail. Continue to pump AP Pump Saver 195 through the system until it comes out of the hose line clear (you will notice a thick, clean fluid).
  21. Turn off supply valves on the hose just before the Handi Gun.
  22. Disconnect the air supply to the stick pumps.
  23. Move the hose supply valve into recirculation position to depressurize the system.
  24. Shut off supply valves to the cabinet.
  25. Turn off heat zones.
  26. Turn off the main disconnect.
  27. Remove residual grease from interior cabinet pumps.
  28. Replace with new grease.

Want more information on the PolyBadger?

Download an Info-Packed PolyBadger System Brochure!

Topics: Equipment & Accessories, All Posts, Lift Slabs

Take Advantage of the Section 179 Tax Break on Equipment Before the Year Ends

Posted by Erik Prinzing on Nov 23, 2021 10:00:00 AM

Banner - Section 179 Tax Break

High-performance polyurethane concrete repair equipment is essential to the success of any contractor in this industry.  For that reason, I'd like to bring the Section 179 tax break to your attention.  According to the Section179.org website...

Essentially, Section 179 of the IRS tax code allows businesses to deduct the full purchase price of qualifying equipment and/or software purchased or financed during the tax year. That means that if you buy (or lease) a piece of qualifying equipment, you can deduct the FULL PURCHASE PRICE from your gross income. It’s an incentive created by the U.S. government to encourage businesses to buy equipment and invest in themselves.  Read more at Section179.org.

If you're currently considering an equipment purchase, you may want to buy before the end of 2021 so you can take advantage of the deduction on this year's tax return.  

Alchemy-Spetec offers a full selection of:

Want more information on Alchemy-Spetec equipment & products?

Download the Info-Packed Geotech Product Catalog!

Download the Info-Packed Leak Seal Product Catalog!

Topics: Equipment & Accessories, All Posts, Business Tips

Contractors Complete Fall 2021 Geotech Training

Posted by Kreg Thornley on Nov 11, 2021 9:30:00 AM

Banner - Contractors Complete Fall 2021 Geotech Training

Body - Contractors Complete Fall 2021 Geotech TrainingOn October 26th - 28th, Contractors across North America traveled to Alchemy-Spetec HQ in Tucker, GA for a thorough education in Slab Lifting, Soil Stabilization, the Deep Lift® process, equipment, and applications. They received hands-on training from a technical staff with decades of on-the-job experience.

This three-day geotech bootcamp featured presentations and demos on the following subjects:

  • Geotech Product Line Overview
  • Geotech Applications & Case Studies
  • PolyBadger® Demo & Training
  • Estimating & Quoting Jobs
  • PMC Pump Demo & Training
  • Leak Seal Issues on Geotech Jobs
  • Ground Penetrating Radar Demo & Training
  • Slab Lift Rig Demo & Training
  • Competing Geotech Techniques
  • PolyShark® / Soil Stabilization Demo & Training (On-Site)
  • Deep Lift® Demo & Training (On-Site)

All of us here at Alchemy-Spetec would like to thank everyone who participated! and extend an invitation to those who missed this event to sign up below for notifications on future training programs.

Sign Up to Get Notified for Future Training Events

Topics: Equipment & Accessories, All Posts, Lift Slabs, Stabilize Soil, Business Tips, Deep Lift, Fill Voids

Winterizing a Slab Lifting Rig

Posted by Stephen C. Barton on Nov 4, 2021 10:00:00 AM

Banner - Winterizing a Slab Lifting Rig

Body - Winterizing a Slab Lifting RigAs the weather gets colder, contractors in some regions will need to prepare their slab lifting rigs for storage during the off-season. We're providing step-by-step instructions for that procedure in this article.

Please Note:

  • You will notice that more care is given to the A-side of the system, this is normal.
  • This procedure assumes you are using a PMC pump.

Prepping a Slab Lifting Rig for Winter Storage

  1. Remove and clean the A and B stick pumps. Clean the exterior of the pumps with brake cleaner to remove as much residual resin and polyol as possible.
  2. Place the A-Side transfer pump into a 5-gallon pail of the AP Flush 121.
  3. Remove the recirculation hose from the A-Side drum and place it in a purge pail.
  4. Open A-Side inlet valve and recirculation valve on your PMC machine.
  5. Slowly open the air valve on the A-Side transfer pump to start introducing the AP Flush 121 through the A-Side of the machine.
  6. You will notice iso material being pushed out of the recirculation line into the purge pail. Continue to pump AP Flush 121 through the system until it comes out of the recirculation line clear, with no added coloring or debris.
  7. Shut the air supply feeding the transfer pump. This will stop all flow of material.
  8. Un-cap the A-Side of the PMC whip hose. Once un-capped, place the hose into the purge pail.
  9. Close the recirculation valve on the A-Side of the PMC machine.
  10. Slowly open the air valve on the A-Side transfer pump to start the flow of AP Flush 121 through the heated hose.
  11. You will notice iso material being pushed out of the whip hose into the purge pail. Continue to pump AP Flush 121 through the system until it comes out of the recirculation line clear, with no added coloring or debris.
  12. Now that this process is complete, the A-Side has been completely cleaned of any iso material.
  13. Remove the A-Side transfer pump from the pail of AP Flush 121 and place it into a 5-gallon pail of AP Lube 190.
  14. Slowly open the air valve on the A-Side transfer pump to start introducing the AP Lube 190 through the A-Side of the machine. Continue to pump the AP Lube 190 until you have pure and clean AP Lube 190 coming out of the end of the whip hose
  15. Place the B-Side stick pump into a separate 5-gallon pail of AP Lube 190.
  16. Slowly open the air valve on the B-Side transfer pump to start introducing the AP Lube 190 through the B-Side of the machine and heated hose. Continue to pump AP Lube 190 through the system until it comes out of the end of the whip hose, with no added coloring or debris.
  17. Once the entire system is full of clean AP Lube 190, slowly start to recirculate the AP Lube 190 through the entire system. When doing this, it is best to let the PMC machine cycle while recirculating the AP lube 190.
  18. Once all these steps are complete, close the air on each transfer pump and re-cap the heated PMC whip hoses.

Want more information on geotech products and equipment?

Download the Info-Packed Geotech Product Catalog!

Topics: Equipment & Accessories, All Posts, Lift Slabs

Stabilizing Soil in Cold Weather

Posted by Stephen C. Barton on Nov 2, 2021 10:00:00 AM

Banner - Stabilizing Soil in Cold Weather 2021

Body - Stabilizing Soil in Cold Weather 2021It's that time of year again. As temperatures drop, take a moment to review this previously posted article packed with cold-weather tips.

In this blog post, we will share some tips for stabilizing soil in cold weather. The two main points to remember are – make sure the ground isn’t frozen and condition your material and equipment properly.

Do Not Attempt Soil Stabilization Work When the Ground is Frozen

If you’re considering soil stabilization in cold weather, the first step is to make sure that the water table isn’t frozen. Iced earth is not permeable enough for proper mixing of resin and soil. If you attempt to proceed with frozen soil, you’ll just be wasting your material. Best to wait it out in that case.

Properly Condition Equipment and Materials

For optimal results, it’s best to store any materials and equipment that are to be used in a heated environment overnight. It’s best to keep your AP Soil 600 above 60 degrees at all times. This is key because cold material reacts slower and gets thicker. The methods you use to condition your material on the job site will depend on the type of vehicle you’re using.

In Slab Lifting in Cold Weather, we described in detail how to condition materials for cold weather if you’re using a rig…

If you have an insulated rig, it should stay around 40 degrees warmer than outside temperatures. Most foam rigs have built-in electric heaters that require an extension cord to a power outlet at the job site or at your facility for overnight storage. Alternately, you could buy an electric radiator heater. Other available heating devices include drum band heaters and heated drum mats (be careful not to scorch the polymers by turning band heaters up too high). For a more DIY approach, you could build a hot box around the material storage area in your rig.

If you’re using pails and a smaller vehicle, we offered tips for that set up in my Polyurethane Leak Seal in Cold Weather article…

Use an enclosed vehicle, like a box truck, enclosed trailer, or pickup truck with a camper top or bed cover. Keep as much material and equipment inside the vehicle as possible when working. Use a portable heater to maintain a warm temperature. You can also use electric pail heaters to keep your resin ready for action.

Using a combination of the methods described above, you should be able to keep your materials warm enough. In extreme cases when the material gets a bit too cold and thick, you may want to use AP Cat 600 to speed up the reaction time.

Conclusion

As long as the ground isn’t frozen, you should be able to stabilize soil in cold weather.  Just make sure your materials and equipment are conditioned properly.  If you have any further questions, please contact us at 404-618-0438.

Want in-depth info on soil stabilization products?

Download an Info-Packed Soil Stabilization Brochure!

Topics: Equipment & Accessories, All Posts, Stabilize Soil, Business Tips

Sealing Leaks in Cold Weather

Posted by Stephen C. Barton on Oct 28, 2021 10:00:00 AM

Banner - Sealing Leaks in Cold Weather 2021

Body - Sealing Leaks in Cold Weather 2021It's that time of year again. As temperatures drop, take a moment to review this previously posted article packed with cold-weather tips.

There are plenty of leak seal jobs that need to be done in the winter. So let's take a look at those cold-weather markets. We'll also review some special considerations for conditioning leak seal material and equipment. Then we’ll leave you with a few cold temperature leak seal application tips.

Cold Weather Markets

You have a variety of options for seeking jobs that are inside, out of the elements, during the winter months.  Hopefully, these ideas will spark more brainstorming on your part. First up we have tunnels, both pedestrian and vehicle. Tunnels often leak, sometimes significantly enough to result in quite a big job. Aquariums are another possibility. As you can imagine, there are infinite potential leak problems in a structure holding that much water. Other possible large jobs could include mines and water treatment plants (which have plenty of interior spaces with potential leak issues). On the smaller side, there are utility vaults, lift stations, manholes, and elevator pits.

If you’re still up for working outside during the winter months, you’re in luck because concrete contracts during colder weather. The contraction makes cracks open wider. Wider cracks make leaks more apparent to the property owner and make them easier to repair.

Conditioning Materials and Equipment

One important point to understand is that cold weather requires you to make an extra effort to keep your materials and equipment warm. Cold material reacts slower and gets thicker. Be sure to store your materials and equipment in a heated room the night before the job. When on the job site, there are many ways to keep everything warm. Use an enclosed vehicle, like a box truck, enclosed trailer, or pickup truck with a camper top or bed cover. Keep as much material and equipment inside the vehicle as possible when working. Use a portable heater to maintain a warm temperature. You can also use electric pail heaters to keep your resin ready for action.

Remember that it won’t do you any good to heat the resin if you’re pumping it through cold equipment. The cold steel inside the pump and the cold hose will literally suck the heat out of the resin before it gets where it needs to be. This will increase the viscosity, making it harder to mix with the water and it will slow down the reaction dramatically. So don’t neglect the equipment side of the equation!

Cold Temperature Application Tips

If you’re using a product with an accelerator, you may need to use a faster accelerator or increase your percentage. Also, bring lots of oakum. You may have to use more if the cold temperature slows down the material or the contracted concrete has made the cracks wider.

If your job requires you to inject into a structure underwater (and the water’s cold), you can use a technique called twin streaming. In this approach, you hook two valves together in a parallel fashion – then inject warm water along with the resin to kick start it reacting before hitting the cold water.

Conclusion

I hope this overview has helped spark some ideas on your part for finding leak seal work during the winter months. Just remember to keep your materials and equipment conditioned and you should be fine. Have more questions about polyurethane leak seal in cold weather? Call us at 404-618-0438.

Want more in-depth info on polyurethane leak sealing?

Download an Info-Packed Leak Seal Brochure!

Topics: Equipment & Accessories, All Posts, Seal Leaks, Business Tips

Lifting Slabs in Cold Weather

Posted by Andy Powell on Oct 26, 2021 10:00:00 AM

Banner - Lifting Slabs in Cold Weather 2021

Body - Lifting Slabs in Cold Weather 2021It's that time of year again. As temperatures drop, take a moment to review this previously posted article packed with cold-weather tips.

Contrary to popular opinion, as a contractor, you don’t have to put up your equipment and rigs due to cold weather. There are many jobs to be done and many ways to keep your material conditioned. Use this season to your advantage and gain valuable business.

Cold Weather Markets

Seasonal attractions such as theme parks are a great place to start looking for winter work. Many of these parks (the ones that aren’t in Orlando) shut down for the winter and this is the time they do maintenance and repairs. Think of all the concrete lifting and leveling that can be done.

Factories can be less active in the winter months with production slowing down in many industries. This is a good time for them to do maintenance and floor repairs as well.

Warehouses typically operate year-round, so there is always work available. Warehouse floors are used and abused on a daily basis and will sooner or later need some form of repairs done to keep business running at a steady pace. In addition, many warehouses have dangerous voids beneath their floors that require repair.  

Exterior concrete slabs are still worth considering, even in the cold weather. These slabs experience the most wear and tear from the environment itself (think erosion) and daily traffic. You’ll need to lift concrete slabs before the ground freezes and only after your materials have been thoroughly conditioned.

Conditioning Materials

Your slab lifting equipment probably has built-in heaters and a heated hose. Each brand and model of pump has different sized pre-heaters and different ∆T (∆ = Delta and T = Temperature). This sounds complicated but is actually quite simple.  ∆T is simply the change in temperature.  Let’s say your material has been sitting in a cold trailer all night and the temperature has dropped to 40 degrees F. If the required temperature of your B side material is 120 degrees F, then your pump better be rated with a ∆T of at least 80 degrees. However, if your material is preconditioned to 70 degrees F, then your machine only has to be rated for a ∆T of 50 degrees. As I said, every machine is rated differently based on the size of the heaters. What is important to know is that there are limitations to how much heating your machine can do.

Keeping your materials conditioned in the winter months is a lot easier than it sounds. The main point is to keep your AP Lift products above 60 degrees at all times. Keeping the polyurethane at or above that temperature can be accomplished in a number of ways.

If you have an insulated rig, it should stay around 40 degrees warmer than outside temperatures. Most foam rigs have built-in electric heaters that require an extension cord to a power outlet at the job site or at your facility for overnight storage. Alternately, you could buy an electric radiator heater. Other available heating devices include drum band heaters and heated drum mats (be careful not to scorch the polymers by turning band heaters up too high). For a more DIY approach, you could build a hot box around the material storage area in your rig.

Heat Sink

Another consideration when lifting cold slabs is the heat sink factor. AP Lift products come out of the gun hot and get even hotter as they react. However, cold concrete acts as a heat sink and sucks the energy out of the foam as it starts to react. This can slow down the reaction speed of the foam. If you are pumping into a void, it will have little effect because most of the foam is not in contact with the concrete. If you are trying to lift a slab with little void, it will have more of an effect because more of the foam is in contact with the cold concrete and cold soil. More volume = more energy.

Conclusion

Don’t let common preconceptions deter you from slab lifting in cold weather. As noted above, there is no need to shut down completely for the upcoming winter months if you don’t want to. Opportunities still exist and one of them may just be the job you’ve been looking for all year. There are many ways to keep your equipment and materials conditioned to efficiently work in lower temperatures. Have more questions about slab lifting in cold weather? Call us at 404-618-0438.

Want more in-depth info on slab lifting?

Download an Info-Packed Slab Lift Brochure!

Topics: Equipment & Accessories, All Posts, Lift Slabs, Business Tips

Reminder! Geotech Training: Oct 26th - 28th, 2021

Posted by Kreg Thornley on Sep 30, 2021 10:00:00 AM

Banner - Reminder Fall Geotech Training

SOLD OUT!

Sign Up to Get Notified for Future Training Events

Alchemy-Spetec HQ in Tucker, GA
Registration Deadline: Tuesday, October 12th

AS-Training-Program---Fall-2021$695 Registration Fee
$615 for each additional participant from
the same company.

Get ready for a thorough education in Slab Lifting, Soil Stabilization, the Alchemy-Spetec Deep Lift® process, equipment, and applications. You’ll get hands-on training from a technical staff with decades of on-the-job experience.

Tuesday, October 26th

  • Geotech Product Line Overview
  • Geotech Applications & Case Studies
  • PolyBadger® Demo & Training
  • Estimating & Quoting Jobs

Wednesday, October 27th

  • PMC Pump Demo & Training
  • Leak Seal Issues on Geotech Jobs
  • Ground Penetrating Radar Demo & Training
  • Slab Lift Rig Demo & Training
  • Competing Geotech Techniques

Thursday, October 28th

  • PolyShark® / Soil Stabilization Demo & Training (On-Site)
  • Deep Lift® Demo & Training (On-Site)

Your Instructors:

Andy Powell (Southeastern Regional Manager), Erik Prinzing (Midwest Regional Manager), Colt Hullander (Director of Technical Services - Geotech), Patrick Zito (Eastern Regional Manager), Joel Bryant (Western Regional Manager).

Topics: Equipment & Accessories, All Posts, Lift Slabs, Stabilize Soil, Business Tips, Deep Lift, Fill Voids

Geotech Training: Oct 26th - 28th, 2021

Posted by Kreg Thornley on Sep 14, 2021 10:00:00 AM

Banner - Geotech Training Fall 2021

SOLD OUT!

Sign Up to Get Notified for Future Training Events

Alchemy-Spetec HQ in Tucker, GA
Registration Deadline: Tuesday, October 12th

AS-Training-Program---Fall-2021$695 Registration Fee
$615 for each additional participant from
the same company.

Get ready for a thorough education in Slab Lifting, Soil Stabilization, the Alchemy-Spetec Deep Lift® process, equipment, and applications. You’ll get hands-on training from a technical staff with decades of on-the-job experience.

Tuesday, October 26th

  • Geotech Product Line Overview
  • Geotech Applications & Case Studies
  • PolyBadger® Demo & Training
  • Estimating & Quoting Jobs

Wednesday, October 27th

  • PMC Pump Demo & Training
  • Leak Seal Issues on Geotech Jobs
  • Ground Penetrating Radar Demo & Training
  • Slab Lift Rig Demo & Training
  • Competing Geotech Techniques

Thursday, October 28th

  • PolyShark® / Soil Stabilization Demo & Training (On-Site)
  • Deep Lift® Demo & Training (On-Site)

Your Instructors:

Andy Powell (Southeastern Regional Manager), Erik Prinzing (Midwest Regional Manager), Colt Hullander (Director of Technical Services - Geotech), Patrick Zito (Eastern Regional Manager), Joel Bryant (Western Regional Manager).

Topics: Equipment & Accessories, All Posts, Lift Slabs, Stabilize Soil, Business Tips, Deep Lift, Fill Voids