The management team at a community pool in Midvale, Utah, faced a significant challenge. A water leak had saturated the silty soil beneath the structure, causing uneven settlement and safety hazards. To address this issue, they brought in geotechnical specialists from Rhino Foundation Systems, who proposed an innovative solution as an alternative to tearing out and replacing the pool. This approach not only promised to stabilize the pool but also lift it back to its proper position.
Powerful Polymers
The key to this solution was Alchatek's AP Lift 440 polyurethane foam. This powerful polymer was chosen for its soil stabilization, load-bearing, and lifting capabilities. Deep soil injections were planned to address the underlying issues. The foam's expanding properties would displace water and stabilize the soil base. This method offered a non-invasive alternative to traditional approaches like helical piles.

Painless Procedures
The process began with a thorough site assessment. The technicians analyzed soil saturation and settlement patterns. Based on this data, a 3-foot by 5-foot injection grid was designed. Next, holes were drilled through the bottom of the pool, and injection rods were installed. AP Lift 440 was injected beneath the structure. As a result, the expanding foam displaced water and stabilized the soil base. Following this, the pool was lifted by 3.5 inches. Finally, the pool deck was adjusted to match the new level.
Rapid Results
The pool was successfully stabilized and leveled with minimal disruption. Moreover, there was no need for extensive excavation. This method proved to be both effective and efficient. The foam injections effectively displaced water and stabilized the soil. Additionally, the lifting process was precise, raising the pool by exactly 3.5 inches. Perhaps most importantly, this solution was cost-effective. It proved quicker and more economical than complete pool replacement.




Manhole infiltration can pose serious risks to nearby structures. In a recent case, water infiltration pulled soil into a manhole, eroded the ground beneath a walkway in front of a residence, and threatened to compromise the home's foundation. Specialists from 


A power outage at a high-rise condo building recently demonstrated the importance of proper underground power line installation. Soil settlement caused the power lines in the duct banks to shear off, cutting electricity to the entire building. Ironically, concrete poured over the lines to "protect" them had contributed to the settlement. 




A broadband provider in Alpharetta, Georgia, contacted a local leak seal contractor after discovering water infiltration through a crawl space wall during heavy rainstorms. Over time, cracks had developed, allowing not only water but also sediment to enter, creating substantial voids outside the fissures upon inspection. Given the sensitivity and high value of the equipment housed within the facility, eliminating all potential leaks in the crawl space became a top priority.


The owner of an apartment complex overlooking Stephen Foster Creek in Gainesville, Florida, faced a critical issue. The embankment below showed signs of erosion, creeping dangerously close to the structures. With each passing day, the unstable ground crept ever closer to the foundations of the residential structures, posing a significant threat to both the buildings and the safety of their inhabitants. The situation demanded immediate attention and a robust, long-term solution to safeguard the property and ensure the well-being of its residents. The predominantly sandy composition of the local soil posed a challenge for stabilization. Consequently, the geotech firm 

Clearwater, Florida public works administrators faced a critical stormwater infrastructure issue. A junction box was leaking through multiple pipe penetrations, compromising system integrity. City officials invited infrastructure repair specialists 
A developer in Miami Beach faced a significant challenge during the construction of a high-rise. Water began seeping into the foundation excavation, threatening the project's progress. The situation demanded swift action and expert intervention. 
Executives at a prominent shipbuilding company discovered a significant problem at one of their largest shipyards. Soil was migrating from the landward side of the bulkheads into the water, resulting in erosion and compromising the stability of the dock slabs. The shipbuilding company enlisted 

The Bowline is an iconic 16-story apartment development located in the Wickham suburb of Newcastle, Australia. There is a secant pile constructed wall system in the basement of this new building. However, an issue arose during the drilling process, where the overlaps were not interlocked correctly, resulting in voids and substantial leaks. This situation posed a risk of sinkhole formation under the main road, the light rail system, and neighboring properties. Furthermore, it led to the accumulation of a substantial water pool within the construction site, impeding further excavation efforts. Geotech contractors The Injection Experts AU were called in to solve the problem.