Body - Sealing Leaks in a Cooling Tower Lift StationA cooling tower lift station under construction in Iuka, Mississippi, had a significant water leak problem. The facility was losing approximately 1,000 gallons of water daily. The source and destination of the leak were unknown. A solution was implemented using concrete sealing techniques. Leak seal experts at Mid-South Concrete Lifting were called in to perform the repairs.

Powerful Polymers

The technicians chose Spetec PUR F400 for the repair. This polyurethane-based material has a closed-cell structure that seals cracks and joints. It remains flexible after curing, which allows for structural shifts. The material is NSF-certified, meeting environmental standards for water-related applications.

Painless Procedures

Due to the leak's unknown location, a comprehensive approach was necessary. The team injected the solution into all of the control joints and treated any visible hairline cracks within the concrete. The entire process was completed in two days, minimizing operational disruption.

Rapid Results

The treatment showed noticeable effects in the control joints. After the procedure, the company refilled the pit. The results met their expectations. Construction at the facility resumed without further delays. The solution effectively addressed the water loss issue while maintaining the structural integrity of the cooling tower lift station.