Case Study - Preventing Undermining: US-98 Stormwater Repair

Posted by Landon Feese on Aug 20, 2025 10:00:00 AM

Banner Graphic - Preventing Undermining US-98 Stormwater Repair

Body Graphic - Preventing Undermining US-98 Stormwater Repair US Highway 98 is the main coastal route along Florida’s panhandle, connecting Panama City Beach, Destin, and Fort Walton Beach. Over time, the Florida Department of Transportation (FDOT) faced persistent issues with groundwater infiltrating the stormwater system. This infiltration carried exceptionally fine “sugar sand” into pipes and manholes, gradually reducing capacity and causing flooding on roadways during heavy rains. The situation escalated when a vehicle was damaged after falling into a void created by soil loss beneath the roadway, highlighting the urgent need for a lasting solution.

Initial Assessment

Inspections found that groundwater was entering through pipe joints, manhole connections, and cracks in concrete structures, transporting fine sand and creating sizable voids beneath the infrastructure. The affected system included concrete pipes ranging in diameter from 36 to 84 inches, with numerous manholes spread along a three-mile stretch of highway. Traditional repair would have required full excavation and replacement—a disruptive and prohibitively expensive process for such a critical transportation corridor. Based on the extent of sand loss and the depth of infrastructure, voids were estimated to range from several inches to several feet around key structures.

Proposed Solution

Alchatek recommended Spetec PUR H100, a semi-rigid polyurethane grout, for comprehensive rehabilitation. This material was chosen for its ability to expand and fill voids, while remaining flexible enough to accommodate minor ground movement and maintain a watertight seal. The approach involved direct injection into leaking joints and cracks, followed by creating a curtain wall around critical structures to prevent further sand migration and stabilize the surrounding soils. FDOT required a five-year warranty on the repair, underscoring both the severity of the problem and their confidence in the solution.

Procedures

  1. Technicians drilled directly into each pipe joint, installing injection ports for precise placement of H100 grout.
  2. Additional holes were drilled about one foot from each joint in a clock-pattern to encapsulate the joints and stabilize the surrounding soil.
  3. Injection began at the lowest point of each structure and progressed upward to ensure complete filling and displacement of water.
  4. Manholes received perimeter injections to form a waterproof curtain wall, with special attention to all pipe penetrations.

Results

Over the course of 18 months, approximately 2,000 pipe joints and numerous manholes were treated along a three-mile stretch of US 98. Since the project's completion in 2017, there have been no warranty claims or reported issues, even during multiple heavy storm seasons. The highway has remained free of flooding and sand accumulation, and no further undermining of the roadbed has occurred. By choosing polyurethane injection over full excavation, the FDOT avoided estimated replacement costs of $7 million to $16.5 million, while keeping the highway open and safe throughout the process.