Pat Mayse Dam Conduit Leak Sealing  BodyGerace Construction was contracted for a project at the Pat Mayse Dam in Paris, Texas, to repair and seal leaks in the discharge conduit. The project involved addressing cracks and weeps within a concrete pipe structure. The United States Army Corps of Engineers (USACE) was overseeing the project, requiring strict adherence to specifications, including the presence of a manufacturer’s representative on-site during the grout injection process.

Initial Assessment

The primary challenge was to stop active water leaks within the concrete conduit pipe. A site visit identified the locations of cracks and weeps, as documented in the photo report included in the specification. The photos showed typical leaking monolith joints on the sides and top of the structure, as well as leaking monolith cracks. These leaks required a solution that could effectively seal actively flowing water in both vertical and horizontal orientations.

Proposed Solution

Alchatek proposed the use of Spetec PUR F400, a flexible polyurethane grout, to address the leaking cracks. This product was selected for its ability to penetrate narrow cracks, its flexibility to accommodate movement, and its compatibility with wet concrete surfaces. The plan included supplying the necessary materials, equipment, and a qualified manufacturer’s representative to supervise the installation.

Procedures

1. Preparation:

  • Injection ports were installed along the identified cracks and weeps in the concrete pipe.
  • Holes approximately 12 inches deep were drilled at a 45-degree angle.

2. Injection Process:

  • Spetec PUR F400, along with Alchatek Gen Cat to control reaction time, was injected through the installed packers using a suitable pump.
  • Injection began at the lowest packer for vertical joints or cracks, working upwards.
  • The process continued until the grout traveled between packers, and the leaks were sealed.
  • An approved epoxy adhesive paste was used to seal the surface of the cracks, allowing grout to travel.

3. Post-Injection:

  • Re-injection was performed to ensure all voids were properly sealed off.
  • Each installed packer was re-injected with a small amount of water to allow the resin in the drill hole to react.
  • The injection ports were removed and cut flush, and packer holes were filled with approved epoxy paste.
  • Once cured, the remaining materials were removed from the concrete surface with a wire brush or handheld grinder.

Results

The Alchatek solution, implemented by Gerace Construction, effectively sealed the cracks and stopped the leaks in the Pat Mayse Dam discharge conduit. The on-site presence of a qualified manufacturer’s representative ensured the proper application of the product, meeting the requirements of the USACE. The project was completed in accordance with the specifications, resulting in a successful repair and improved structural integrity of the dam’s discharge conduit.

Want more information on polyurethane leak seal materials?