The LJS crew “constructed” these sections of the underground wall by injecting AP Fill 700. This is a single component, water-activated, hydrophobic, low viscosity, closed-cell polyurethane injection resin. This grout was used because it permeates the soil, fills small voids in the soil, and cuts off water flow.
LJS professionals used a Geoprobe to drive injection pipes into the ground (up to 33 feet in some locations). They then injected one gallon per foot using upward staging. The next injection point was 18 inches away from the first one. This process was repeated until a grout wall formed, filling the gap between the two adjacent underground sheet piles. For a large-scale job like this, LJS used the PolyShark single component grout pump.
With solid, impermeable grout walls filling in the gaps, a sub-surface barrier between the riverbank and the drinking water facility was now in place. The planners at D.C. Water were very satisfied with this solution. LJS Waterproofing came through exactly in the way they had promised.