An Alchatek support technician worked with the contractor to conduct a thorough assessment and implemented a targeted void-filling solution to restore stability.
Alchatek recommended using AP Lift 430 Fast, a high-performance polyurethane foam designed for rapid void filling and stabilization. This material was selected for its quick-setting properties, high compressive strength, and ability to effectively fill voids while providing robust support for the concrete slab. The approach ensured minimal disruption to the parking garage operations, as it required no extensive excavation.
The void-filling project at the Brookhaven City Hall parking garage was a success. The application of AP Lift 430 Fast effectively filled all identified voids, eliminating the risk of further settlement. The stabilized concrete slab restored the structural integrity of the garage floor, ensuring a safe and functional environment for vehicles and pedestrians. The solution minimized operational downtime and avoided costly excavation, preserving the facility’s functionality.