 Written by [Ammad Hashmi](https://info.alchatek.com/blog/author/ammad-hashmi) | Jul 30, 2025 2:00:00 PM

## Initial Assessment

The team at [PURLevel](https://www.purlevel.com/) was contacted regarding significant floor settlement issues at Outpost Harley-Davidson in Pueblo, Colorado, where a water pipe rupture had resulted in concrete movement and void spaces beneath the floor. The affected areas showed uneven surfaces with depressions ranging from 0.25 to 3 inches, creating hazards for both foot and equipment traffic.

## Proposed Solution

[AP Lift 430](https://alchatek.com/geotech/polyurethane-concrete-leveling-products/concrete-slab-jacking-foam-ap-lift-430/) polyurethane foam was selected for this project due to its excellent void-filling and lifting capabilities. With its 22x expansion capability and 7,200 psf compressive strength, this material is ideal for commercial floors supporting heavy equipment like that found in a motorcycle dealership.

## Procedures

1. **Site Preparation**
   
     - The affected area was thoroughly inspected to determine the full extent of damage.
     - A 5'x5' grid pattern was marked across the entire interior floor area.
2. **Grid Injection**
   
     - Strategically placed injection points were established following the grid pattern.
     - Holes were drilled through the concrete slab at each injection point.
     - Polyurethane foam was systematically injected to fill voids beneath the slab.
3. **Lift and Stabilization**
   
     - After initial void filling, additional injections were performed to lift the sunken areas gradually.
     - An incremental lifting approach was used to prevent concrete cracking.
     - Areas requiring significant lift (up to 3 inches) received multiple injection passes.
     - Levels were continuously monitored to ensure even lifting across the floor surface.

## Results

The project successfully stabilized the Outpost Harley-Davidson floor and restored it to its proper level. The comprehensive void-filling addressed the underlying instability caused by the water pipe rupture, providing a solid foundation for the concrete slab. Success was evident in the restored functionality of the dealership floor and the elimination of safety hazards posed by the uneven surface.

### Want more information on leveling concrete slabs?

[View full post](https://info.alchatek.com/blog/at-case-study-slab-leveling-at-a-harley-davidson-dealership)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Ammad Hashmi"
  },
  "dateModified" : "2025-07-30T14:00:00.516Z",
  "datePublished" : "2025-07-30T14:00:00Z",
  "headline" : "AT Case Study - Slab Leveling at a Harley-Davidson Dealership",
  "image" : {
    "@type" : "ImageObject",
    "height" : 560,
    "url" : "https://2515821.fs1.hubspotusercontent-na1.net/hubfs/2515821/Social%202%20-%20Case%20Study%20-%20Slab%20Leveling%20at%20a%20Harley-Davidson%20Dealership.jpg",
    "width" : 1080
  },
  "mainEntityOfPage" : "https://info.alchatek.com/blog/at-case-study-slab-leveling-at-a-harley-davidson-dealership",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Alchatek Blog"
  }
}
```