The team at PURLevel was contacted regarding significant floor settlement issues at Outpost Harley-Davidson in Pueblo, Colorado, where a water pipe rupture had resulted in concrete movement and void spaces beneath the floor. The affected areas showed uneven surfaces with depressions ranging from 0.25 to 3 inches, creating hazards for both foot and equipment traffic.
AP Lift 430 polyurethane foam was selected for this project due to its excellent void-filling and lifting capabilities. With its 22x expansion capability and 7,200 psf compressive strength, this material is ideal for commercial floors supporting heavy equipment like that found in a motorcycle dealership.
Site Preparation
Grid Injection
Lift and Stabilization
The project successfully stabilized the Outpost Harley-Davidson floor and restored it to its proper level. The comprehensive void-filling addressed the underlying instability caused by the water pipe rupture, providing a solid foundation for the concrete slab. Success was evident in the restored functionality of the dealership floor and the elimination of safety hazards posed by the uneven surface.